Showing first 4 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Scope changed: Noise mitigation wall only, supported by open structure.To construct open air platform structure (attached to existing building), proposed on the North/East side of the Industrial Bu…
HVAC - Construct (3) mezzanine levels for mechanical equipment space at basement, ground and second floor to existing bakery manufacturing *Marmora Freezing Corp*
Construct (3) levels addition for mechanical equipment space at basement, ground and second floor to existing bakery manufacturing *Marmora Freezing Corp*
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.