60 PLAYFAIR AVE
REV 04: Revising R2 roof type to delete vegetated roofing, associated pre-cast paver edging. Rev 03 - Revising 1 public washroom on third floor to be gender inclusive; reverting 1 public washroom o…
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REV 04: Revising R2 roof type to delete vegetated roofing, associated pre-cast paver edging. Rev 03 - Revising 1 public washroom on third floor to be gender inclusive; reverting 1 public washroom o…
1 ground sign**DANTE ALIGHIERI ACADEMY CATHOLIC SECONDARY SCHOOL**
Rev 03 - Revising 1 public washroom on third floor to be gender inclusive; reverting 1 public washroom on second floor to original permit design.REV 02: Revision to third floor washroom and second …
REV 02: Revision to third floor washroom and second floor washroom.Construction of new 3 storey school with associated playscapes and parking
1 ground sign**Regina Mundi Catholic School**
REV 01 - Revision to match BLD revisionPlumbing - Construction of new 3 storey school with associated playscapes and parking
REV 01 - Revision to match BLD revisionHVAC - Construction of new 3 storey school with associated playscapes and parking
REV 01 - Revision to 2 public washrooms on second floor to be gender inclusive washroomsConstruction of new 3 storey school with associated playscapes and parking
1 GROUND SIGN**REGINA MUNDI ELEMENTARY SCHOOL**
Part Permit - Construction of new 3 storey school with associated playscapes and parking
Part Permit - Construction of new 3 storey school with associated playscapes and parking
FS - Sprinkler Shop Drawing - Construction of new 3 storey school with associated playscapes and parking
REVISION 02 - The proposed changes include removal of existing ceiling tiles at Ground, Second & Third floors. Application of 1-hour spray fireproofing (ULC D788) to the existing structure, and ins…
HVAC 01- The proposed changes include removal of existing ceiling tiles at Ground, Second & Third floors. Application of 1-hour spray fireproofing (ULC D788) to the existing structure, and installa…
Drain - Construction of new 3 storey school with associated playscapes and parking
Site services - Construction of new 3 storey school with associated playscapes and parking
HVAC - Construction of new 3 storey school with associated playscapes and parking
Construction of new 3 storey school with associated playscapes and parking
Plumbing - Construction of new 3 storey school with associated playscapes and parking
Demolition of the existing 2 storey Regina Mundi school including all structures
Page numbers are hidden until the total count is available from the data service.