Showing first 7 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
HVAC - Proposal for multiple projects to an existing 2 storey mixed use building. Scope of work includes a new 3rd floor addition, interior alterations, a bsement walkout, exit stairs from the 3rd …
Plumbing - Proposal for multiple projects to an existing 2 storey mixed use building. Scope of work includes a new 3rd floor addition, interior alterations, a bsement walkout, exit stairs from the …
Proposal for multiple projects to an existing 2 storey mixed use building. Scope of work includes a new 3rd floor addition, interior alterations, a basement walkout, exit stairs from the 3rd and 2n…
HVAC upgrade to an existing mixed-use commercial-residential 2-storey building: work involves replacement of oil-fed furnace with gas-fed furnace in the basement, and update of all ductwork in the …
Installation of a steel frame at rear of existing building to support new ac units (see 06-183004 for related mech. permit).
HVAC upgrade to an existing mixed-use commercial-residential 2-storey building: work involves replacement of oil-fed furnace with gas-fed furnace in the basement, and update of all ductwork in the …
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.