Showing first 8 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REVISION 4 - as built drawingsProposal for a 2 storey rear addition, basement walkout, basement finishing, interior alterations to the ground floor, new deck on the ground floor, to existing 2 stor…
REVISION 03 - revision to interior layout, new balconies at front and rear of building. REVISION 2 - structural changes as per drawings Proposal for a 2 storey rear addition, basement walkout, base…
Drain - Proposal for a 2 storey rear addition, basement walkout, basement finishing, interior alterations to the ground floor, new deck on the ground floor, to existing 2 storey semi-detached SFD.
Plumbing - To install fixtures throughout dwelling.
REVISION 2 - structural changes as per drawings Proposal for a 2 storey rear addition, basement walkout, basement finishing, interior alterations to the ground floor, new deck on the ground floor, …
REVISION TO PERMIT: This is a revision to the underpinning portions and details along with structural changes to the ground floor. The areas of reviison are cloud bubbled on the plans.Original prop…
Proposal for a 2 storey rear addition, basement walkout, basement finishing, interior alterations to the ground floor, new deck on the ground floor, to existing 2 storey semi-detached SFD.
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.