65 DUNDAS ST E
Revision 3 - Updated kitchen designHVAC - PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordabl…
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Revision 3 - Updated kitchen designHVAC - PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordabl…
REVISION - The MUA on the roof was not captured properly in the previous BPHVAC - PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and constructio…
Revision 2 - Updated kitchen designREV#1: Renovation and conversion of existing Hotel Building into affordable housing by City of Toronto. Updated fire separation assemblies as per project requirem…
Revision 01 - Revision 2 - Updated kitchen designHVAC - PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hote…
Plumbing - PHASE 3 - Level 13 to Level 18Proposal for renovation and conversion of existing Hotel Building into affordable housing by City of Toronto. Scope of work includes renovating the interior…
Proposal for renovation and conversion of existing Hotel Building into affordable housing by City of Toronto. Scope of work includes renovating the interior spaces and finishes and associated Mecha…
- PHASE 3 - Level 13 to Level 18Proposal for renovation and conversion of existing Hotel Building into affordable housing by City of Toronto. Scope of work includes renovating the interior spaces a…
REV#1: Renovation and conversion of existing Hotel Building into affordable housing by City of Toronto. Updated fire separation assemblies as per project requirements.PHASE 1 - Basement Level 02 to…
Proposal to design and install the fire protection systems for the 19 storey building being converted to affordable housing. See related permits 22 217753 BLD (Phase 1), and 23 108352 BLD (Phase 2).
FS - Sprinkler Shop Drawing - PHASE 2 - Level 8 to Level 12Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing. Refer to P…
PHASE 2 - Level 8 to Level 12Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing. Refer to Permit 22 217753 BLD 0 BA For P…
HVAC - PHASE 2 - Level 8 to Level 13Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.
Plumbing - PHASE 2 - Level 8 to Level 13Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.
FS - Sprinkler Shop Drawing - PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.
Plumbing - PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.
PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.
HVAC - PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.
Replacement of the existing ¿EDWARDS EST3" Fire Alarm Control Panel and annunciator with a new ¿MIRCOM FX-2000¿ Fire Alarm Control Panel and annunciator in the same locations.Replacement of: all EO…
Deferred Fees from folder20 166644 BLD 00 BA(RSN-4969409)
HVAC - Proposal for renovation of portion of ground floor of existing building and addition at open area at underside of 2nd floor.
Page numbers are hidden until the total count is available from the data service.