Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
To installation of six (6) maglocks related to building permit 25 226787 BLD 00 BA
Plumbing - Proposal for Interior alterations of the 14th floor in an existing Group D occupancy office building.
HVAC - Proposal for Interior alterations of the 14th floor in an existing Group D occupancy office building.
Proposal for Interior alterations of the 14th floor in an existing Group D occupancy office building.
HVAC - Proposal for Interior alterations of the 12th floor in an existing Group D occupancy office building.
Proposal for Interior alterations of the 12th floor in an existing Group D occupancy office building.
HVAC - Interior alterations of one meeting room in an existing Group D occupancy office building - 11F.
Interior alterations of one meeting room in an existing Group D occupancy office building. 11F.
Revision 01 - Maglock revision to permit 25 147862 FSU 00 FS------------------------------------------------------------Maglock permit applicaiton related to 25 141248
Maglock permit applicaiton related to 25 141248
Plumbing - Interior alterations of one floor in an existing Group D occupancy office building
Interior alterations of one floor in an existing Group D occupancy office building
HVAC - Interior alterations of one floor in an existing Group D occupancy office building
HVAC - Proposal for early Works for future tenant fit up. Removal of existing Raised Access Floor and CIP slab knock out panels at Levels 13 through 18. Alteration of ceiling mounted MEP items in w…
Proposal for early Works for future tenant fit up. Removal of existing Raised Access Floor and CIP slab knock out panels at Levels 13 through 18. Alteration of ceiling mounted MEP items in work are…
HVAC - Division of mercantile suite into two. Provide basic HVAC and Power for the purpose of tenant lease agreement.
Division of mercantile suite into two. Provide basic HVAC and Power for the purpose of tenant lease agreement.
Plumbing - Division of mercantile suite into two. Provide basic HVAC and Power for the purpose of tenant lease agreement.
Altering wet sprinkler system on levels 4-11 to accommodate convenience stair.
Page numbers are hidden until the total count is available from the data service.