Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Plumbing - Proposal for Interior Alterations for tenant fitout, dential office
HVAC - Proposal for Interior Alterations for tenant fitout, dential office
Proposal for Interior Alterations for tenant fit out, dental office
Proposal for an alternative solution for fire protection - sprinklers, fire alarms
Proposal for interior alterations, fitout for new office.
HVAC - Proposal for interior alterations, fitout for new office.
Plumbing - Proposal for interior alterations, fitout for new office.
REV06: Proposed revision for minor re-allocation of parking and loading spaces to suit actual use of areas. Changes result in loss of 2 parking spaces, however, overall zoning bylaw parking and loa…
Revision 7: Revision to permit for minor reconfiguration of parking and loading areas to reflect site conditions
REV06: Proposed revision for minor re-allocation of parking and loading spaces to suit actual use of areas. Changes result in loss of 2 parking spaces, however, overall zoning bylaw parking and loa…
REV06: Proposed revision for minor re-allocation of parking and loading spaces to suit actual use of areas. Changes result in loss of 2 parking spaces, however, overall zoning bylaw parking and loa…
REV05: Proposed revision for minor re-allocation of parking and loading spaces to suit actual use of areas. Changes result in loss of 2 parking spaces, however, overall zoning bylaw parking and loa…
Revision 03: Revision to include addition of storm manhole on north side of Block E for Block roof leader connection.
HVAC - Proposal for interior alterations to office space (main and second floor).
Proposal for interior alterations to office space (main and second floor).
Revision 05 - layout changes for Block A Rev 04 - Structural changes related to the submitted building with repairs/changes see structural, architectural and electrical drawingsREVISION 03 : stuctu…
Revision - Wahsroom and plumbing fit out locations have been reivsed to suit units. Rev 05 - Plumbing changes for Block A related to the submitted building with repairs/changes in the system.REVISI…
Revision: Ground floor layout adjustments
Rev 05 - Plumbing changes for Block A related to the submitted building with repairs/changes in the system.REVISION 04: The block originally had eight units, but we have decided to split three doub…
Page numbers are hidden until the total count is available from the data service.