66 WELLINGTON ST W
Proposed interior alterations to include non-load bearing partition construction on part of the 44th floor.
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposed interior alterations to include non-load bearing partition construction on part of the 44th floor.
HVAC - Proposed interior alterations to include non-load bearing partition construction on part of the 44th floor.
Plumbing - Proposed interior alterations to include non-load bearing partition construction on part of the 44th floor.
HVAC - Proposal for interior alteration for tenant fit out
Plumbing - Proposal for interior alteration for tenant fit out
Proposal for interior alteration for tenant fit out
Proposal for the installation of four (4) new maglocks and upgrading four (4) existing maglock control panels.
REVISION 2 - FINALIZING 33RD FLOOR CORRIDOR CEILINGS
REVISION 2 - FINALIZING 33RD FLOOR CORRIDOR CEILINGS
Revision 01: FOR P1 LEVEL REVISIONS AND P2 LEVEL EQUIPMENT ENCLOSURESINTERIOR ALTERATIONS FOR TDC TOWER 1 - P1 LEVEL NETWORK EQUIPMENT ROOM
Reviison 01: FOR P1 LEVEL REVISIONS AND P2 LEVEL EQUIPMENT ENCLOSURESHVAC - INTERIOR ALTERATIONS FOR TDC TOWER 1 - P1 LEVEL NETWORK EQUIPMENT ROOM
Repairing and replacing end of life plumbing equipment in commercial building.
Repairing and replacing end of life plumbing equipment in commercial building.
Proposed interior renovation and reconfiguration of existing retail tenant sales space, excluding existing storage room. HVAC & electrical revised to suit new layout.
Plumbing - Proposed interior renovation and reconfiguration of existing retail tenant sales space, excluding existing storage room. HVAC & electrical revised to suit new layout.
HVAC - Proposed interior renovation and reconfiguration of existing retail tenant sales space, excluding existing storage room. HVAC & electrical revised to suit new layout.
INSTALL 24 NEW MAG-LOCKS AND ASSOCIATED DEVICES ON THE 31ST, 32ND AND 33RD FLOORS.
Revision 1: HVAC - Proposed interior tenant fit-out of two and half floors of space within TD Centre on floors 31,32 & 33.
Revision 1: Proposed interior tenant fit-out of two and half floors of space within TD Centre on floors 31,32 & 33.See 25-256803 ALT 00 AS for Alternative Solution
REV01: Proposed revision with a minor adjustment to a wall location and exit signProposal for interior alterations and fit-out of commercial office space on 5th floor.
Page numbers are hidden until the total count is available from the data service.