67 RICHMOND ST W
REVISION 2 - Additional suites to be included: 200, with 300, 400, 500 & 600REVISION - Additional suites to be included: 300, 400, 500 with 600HVAC - Interior alterations - Unit 600
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REVISION 2 - Additional suites to be included: 200, with 300, 400, 500 & 600REVISION - Additional suites to be included: 300, 400, 500 with 600HVAC - Interior alterations - Unit 600
REVISION 02 : Additional suites to be included: 200, with 300, 400, 500 & 600REVISION - Additional suites to be included: 300, 400, 500 with 600Plumbing - Interior alterations - Unit 600
REVISION 02 : Additional suites to be included: 200, with 300, 400, 500 & 600REVISION - Additional suites to be included: 300, 400, 500 with 600Interior alterations - Unit 600
REVISION - Additional suites to be included: 300, 400, 500 with 600Interior alterations - Unit 600
REVISION - Additional suites to be included: 300, 400, 500 with 600Plumbing - Interior alterations - Unit 600
REVISION - Additional suites to be included: 300, 400, 500 with 600HVAC - Interior alterations - Unit 600
Plumbing - Interior alterations - Unit 600
HVAC - Interior alterations - Unit 600
Interior alterations - Unit 600
REVISION - Architectural revision to add on 2nd floor a new suite (206) as well as a changeroom within the suite (207)Plumbing - Phase 2: (22 130654 BLD 00 BA) Interior Alteration: base building co…
REVISION 4 - Architectural revision to add on 2nd floor a new suite (206) as well as a changeroom within the suite (207)Phase 2: (22 130654 BLD 00 BA) Interior Alteration: base building core and sh…
REVISION 4 - Architectural revision to add on 2nd floor a new suite (206) as well as a changeroom within the suite (207)HVAC - Phase 2: (22 130654 BLD 00 BA) Interior Alteration: base building core…
Revision 02 - add a new 2hr rated shaft for refrigerant lines (leves 2-7) and structural revision to add reinforcing at shaft openingsREVISION 01: Architectural revision is to add non-rated gypsum …
REV HVAC - Proposal for Mechanical revision toreroute VRF refrigerant lines into new rated shaft. Structural revision is there to add reinforcing at shaft openings
Revision 02 - add a new 2hr rated shaft for refrigerant lines (leves 2-7) and structural revision to add reinforcing at shaft openingsREVISION 01: Architectural revision is to add non-rated gypsum …
REVISION 01: HVAC - Phase 2: (22 130654 BLD 00 BA) Interior Alteration: base building core and shell space upgrade, new HVAC & electrical system, new base building washrooms, and new elevator lobby…
REVISION 01: Architectural revision is to add non-rated gypsum ceiling on Levels 2 through7 and an Electrical revision to add exit signs, fire alarm devices, and modify the emergency lighting layou…
REVISION 2- changes to the interior layout[Construct alterations for a new restaurant w/patio]
REVISION 2- changes to the interior layoutPlumbing - Construct alterations for a new restaurant w/patio
REVISION 2- changes to the interior layoutHVAC - Construct alterations for a new restaurant w/patio
Page numbers are hidden until the total count is available from the data service.