168 BROCK AVE
HVAC - Proposal for interior alterations to an existing SFD-semi dwelling, to include a new basement unit.See also 26 125484 WNP.
Showing first 9 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
HVAC - Proposal for interior alterations to an existing SFD-semi dwelling, to include a new basement unit.See also 26 125484 WNP.
Proposal for interior alterations to an existing SFD-semi dwelling.See also 26 125484 WNP.
Plumbing - Proposal for interior alterations to an existing SFD-semi dwelling.See also 26 125484 WNP.
Plumbing - Proposal to underpin the foundation; residentail building.
REVISION - partywall underpinning; front basement walkout and side basement walkoutProposal to underpin the foundation; residentail building.
Proposal to underpin the foundation; residentail building.
Adding a new column for additional structure for existing porch, replace handrails and repair existing stairs
Proposal to construct basement underpinning, two (2) basement walk outs at side and front of the building
Drain - Proposal to construct basement underpinning, two basement walk outs at side and rear of sfd
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.