69 TORBARRIE RD
To erect and display one illuminated ground sign, measuring 1.22 m by 0.92 m at the height of 1.83 meters on the western property line.****SMART STOP SELF STORAGE****
Showing first 14 matching permits
More may match beyond this page.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
To erect and display one illuminated ground sign, measuring 1.22 m by 0.92 m at the height of 1.83 meters on the western property line.****SMART STOP SELF STORAGE****
Plumbing - Revision #1;. Re-routing of underground plumbing below 1st floor slab-on-groundTo construct a new four-storey building which will contain a self storage warehouse.
Revision #1: 1. Elimination of one elevator at gridlines E3 2. Removal of corridor between lockers along gridline 7 3. Re-routing of underground plumbing below 1st floor slab-on-ground.To construct…
The applicant has proposed to erect and display two illuminated wall signs displaying static copy, one measuring 6.4 meters horizontally by 3.35 meters vertically at the height of 13.6 meters and o…
Drain - To construct a new four-storey self storage warehouse.building.
This proposal is to supply and install a standpipe system utilizing the prescribed method as detailed in the national building code of canada 3.2.5.9.- 3.2.5.10 in lieu of the Ontario building Code…
Plumbing - To construct a new four-storey building which will contain a self storage warehouse.
HVAC - To construct a new four-storey building which will contain a self storage warehouse.
To construct a new four-storey self storage warehouse.building.
Proposal to demolish two storey abandoned office building structure.
Conditional Permit - Part Permit - Addition behind the front 2 storey office of 3 storey above ground to the one storey industrial section, using a prefabricated CLT building structure. New conrete…
Drain - Addition behind the front 2 storey office of 3 storey above ground to the one storey industrial section, using a prefabricated CLT building structure. New conrete floor slab to replaced exi…
Addition behind the front 2 storey office of 3 storey above ground to the one storey industrial section, using a prefabricated CLT building structure. New conrete floor slab to replaced existing re…
Proposal to demolish the rear industrial area roof and partition walls to the concrete slab. Cutting of slab and removal of concrete debris in order to prepare for new concrete slab and new elevato…
End of list for these filters.
Updated Nov 15, 2026