70 DUNFIELD AVE
REV 01: evision for the extended natural gas piping to connect CP-29 NG Generator at 75 Holly St to the existing natural gas distribution system, as shown on the attached drawings.This is a revisio…
Showing first 14 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REV 01: evision for the extended natural gas piping to connect CP-29 NG Generator at 75 Holly St to the existing natural gas distribution system, as shown on the attached drawings.This is a revisio…
Revision 01 - Revision to address site conditions and AHJ requirements. ----------------------------------------------------Proposal to remove existing generator on Level P1, renovate and upgrade r…
HVAC - Proposal to remove existing generator on Level P1, renovate and upgrade room for installation of new generator. Provide miscellaneous interior and exterior mechanical and electrical works on…
Plumbing - Proposal to remove existing generator on Level P1, renovate and upgrade room for installation of new generator. Provide miscellaneous interior and exterior mechanical and electrical work…
Proposal to remove existing generator on Level P1, renovate and upgrade room for installation of new generator. Provide miscellaneous interior and exterior mechanical and electrical works on Levels…
Revision 01- please see attched application form for work description. Interior alterations - New Rec room kitchenette with no kitchen
HVAC - Proposed replacement of make up air unit.
Proposed replacement of make up air unit.
HVAC - Replacement of existing backup diesel generator with new natural gas fueled generator
Replacement of existing backup diesel generator with new natural gas fueled generator
HVAC - Interior alterations - New Rec room kitchenette with no kitchen
Plumbing - Interior alterations - New Rec room kitchenette with no kitchen
Interior alterations - New Rec room kitchenette with no kitchen
Proposal for concrete repairs to the balcony slab and balcony guard replacement to the existing apartment building.
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.