700 ARROW RD
Proposal for removal of an existing abandoned underground storage tank and replacement of existing waste oil aboveground storage tank in a new area.
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposal for removal of an existing abandoned underground storage tank and replacement of existing waste oil aboveground storage tank in a new area.
HVAC - Proposal for removal of an existing abandoned underground storage tank and replacement of existing waste oil aboveground storage tank in a new area.
HVAC - Proposal to replace six(6) bus hoists and associated components in an existing TTC bus maintenance facility.
Proposal to replace six(6) bus hoists and associated components in an existing TTC bus maintenance facility.
Plumbing - Proposal to replace six(6) bus hoists and associated components in an existing TTC bus maintenance facility.
SHORING - Excavate & shoring for the removal of existing underground tanks at TTC bus garage at 3 locations, totaling 90.95m2 of shoring. There is a building permit for the work but does not includ…
HVAC - To add one exterior exit door - Arrow Road Garage
To add one exterior exit door - Arrow Road Garage
Replacement of two existing 45,000L volume diesel fuel above ground storage tanks and associated appurtnenances
Plumbing - Dispose and replace underground storage tanks and Interceptor USTs, for Engine Oil, Transmission Oil, with New Aboveground Storage Tanks ASTs and monitoring system
Dispose and replace underground storage tanks and Interceptor USTs, for Engine Oil, Transmission Oil, with New Aboveground Storage Tanks ASTs and monitoring system
HVAC - Dispose and replace underground storage tanks and Interceptor USTs, for Engine Oil, Transmission Oil, with New Aboveground Storage Tanks ASTs and monitoring system
Convert existing paint shop to a repair shop - see memo for explination. No construction change of use only.
Revision #01 - Proposed changes to separation wall Dwg No. S-103, Section Detail 2. Proposal for a concrete slab to support energy storage containers.
Proposal for a concrete slab to support energy storage containers.
Rehabilitation of concrete floor slab including replacement of damaged sections.
INSTALLATION OF BUS HOIST IN PIT AND ASSOCIATED CONTROLS/PLUMBING AND DRAINAGES
HVAC - INSTALLATION OF BUS HOIST IN PIT AND ASSOCIATED CONTROLS/PLUMBING AND DRAINAGES
Plumbing - INSTALLATION OF BUS HOIST IN PIT AND ASSOCIATED CONTROLS/PLUMBING AND DRAINAGES
Interior alterations to create a temporary work space until renovations elsewhere are complete.
Page numbers are hidden until the total count is available from the data service.