171 KING ST E
Proposal to remove a load bearing wall and replacing it with a steel beam.
- Permit number
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposal to remove a load bearing wall and replacing it with a steel beam.
Deferred Fees from folder 25 150717 (RSN-5622903) ZoningProcess RSN 77111777
Proposal for interior alterations to ground floor (fire seperation),
Proposed conversion of existing second and third floor to 11 residential and 3 commercial units for existing four-storey commercial/office building.
Plumbing - Proposed conversion of existing second and third floor to 11 residential and 3 commercial units
HVAC - Proposed conversion of existing second and third floor to 11 residential and 3 commercial units
REVISION - structural changes to the basement plan for underpinning and front elevationInterior alterations to existing suite for a new Dental Clinic, with associated structural work at main floor …
HVAC - Proposed interior alteration of existing residential units on the second to fourth floor of a mixed use building. (See Admin Permit 23 229436 and 23 229432)
Plumbing - Proposed interior alteration of existing residential units on the second to fourth floor of a mixed use building. (See Admin Permit 23 229436 and 23 229432)
Proposed interior alteration of existing residential units on the second to fourth floor of a mixed use building. (See Admin Permit 23 229436 and 23 229432) ***** Number of dwelling units increased…
Plumbing - Interior alterations - Unit 1, add new partition walls and suspended ceiling for retail estate office use
Proposal for interior alterations to base building shell retail unit #1 to be converted into a new premises used for a real estate office tenant - 'Angelo D'Elia'. This new office tenant will be lo…
HVAC - Interior alterations - Unit 1, add new partition walls and suspended ceiling for retail estate office use
Proposal for construction of demising wall between leasable units.
Interior alterations to existing suite for a new Dental Clinic, with associated structural work at main floor and basement (lowered floor).
HVAC - Proposed interior alterations to basement and ground floor to convert from restaurant to Group D Dental Clinic
Plumbing - Proposed interior alterations to basement and ground floor to convert from restaurant to Group D Dental Clinic
Drain - install sump pump Repair and reinforce existing basement
Plumbing - Repari and reinforce existing basement
Repair and reinforce existing basement (>36 seats for restaurant on ground floor)
Page numbers are hidden until the total count is available from the data service.