71 MAYBROOK DR
Revision 1: Keeping universal washroom.Proposed layout reconfiguration of lunchroom, change rooms and washrooms.
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Revision 1: Keeping universal washroom.Proposed layout reconfiguration of lunchroom, change rooms and washrooms.
Drain - PROPOSED CONSTRUCTION OF TWO ADDITIONS TO MAIN FACILITY AND ONE ADDITION TO EXTERIOR STORAGE BUILDING.
HVAC - PROPOSED CONSTRUCTION OF TWO ADDITIONS TO MAIN FACILITY AND ONE ADDITION TO EXTERIOR STORAGE BUILDING.
Plumbing - PROPOSED CONSTRUCTION OF TWO ADDITIONS TO MAIN FACILITY AND ONE ADDITION TO EXTERIOR STORAGE BUILDING.
PROPOSED CONSTRUCTION OF TWO ADDITIONS TO MAIN FACILITY AND ONE ADDITION TO EXTERIOR STORAGE BUILDING.
HVAC - Proposed layout reconfiguration of lunchroom, change rooms and washrooms.
Plumbing - Proposed layout reconfiguration of lunchroom, change rooms and washrooms.
Proposed layout reconfiguration of lunchroom, change rooms and washrooms.
Proposed replacement of fire alarm control panel, all devices to remain the same
Proposed demolition of 2 small part 9 fabric clad storage buildings. No replacement buildings.
<4 Application for a permit to erect and display one illuminated wall sign.*****TRENCH*****
Proposed new backflow prevention device
Remove existing sprinkler system and install 2 new sprinkler systems.
To construct a rear detached unheated storage building
Drain - To construct a rear detached unheated storage building
Proposed new fire rated window in fire wall
Proposed new free standing mezzanine in the existing industrial building.
Emergency replacement of main fire alarm panel and system annunciator due to component failure and obsolete parts. Replacement consisting of main panel components, hardware and software to bring ex…
Proposal to alter existing structural bracing and the creation of 2 exterior openings to accommodate exterior equipment in existing industrial building.
Install new building to provide dry storage of coils in process- 30 ft. x 50 ft.
Page numbers are hidden until the total count is available from the data service.