72 PERTH AVE
Conditional Permit - Part Permit - Proposal to construct a new 19-storey residential building with 255 units and 1 level of underground parking.
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Conditional Permit - Part Permit - Proposal to construct a new 19-storey residential building with 255 units and 1 level of underground parking.
Part Permit - Proposal to construct a new 19-storey residential building with 255 units and 1 level of underground parking.
Part Permit - Proposal to construct a new 19-storey residential building with 255 units and 1 level of underground parking.
Backflow preventer to be installed; requesting to utilize the existing water main lateral that is on site for water usage during construction of a new 19-storey residential building
Deferred Fees from folder 25 268265 (RSN-5757916) ZoningProcess RSN 78820403
Plumbing - Proposal to construct a new 19-storey residential building with 255 units and 1 level of underground parking.
Drain - Proposal to construct a new 19-storey residential building with 255 units and 1 level of underground parking.
Proposal to to drill boreholes for an underground geothermal energy system. Start dateanticipated to be March 2025.
Proposal to construct a new 19-storey residential building with 255 units and 1 level of underground parking.
Drain - Proposal to construct a new 19-storey residential building with 255 units and 1 level of underground parking.
HVAC - Proposal to construct a new 19-storey residential building with 255 units and 1 level of underground parking.
Demolition of existing building
Proposed demolition of the existing double height concrete block and brick building (no basement).
Proposed 16 storey residential buliding with 208 residential units and 44 parking spaces.
Proposal for a mid-rise residential building, incorporating a geothermal system, ensuring that the proposed development.
Proposal to demolish the north portion of the building while the south portion will be retain
HVAC - Underpinning existing basement walls, drop floor slab, finish basement including new bathroom and laundry, refinish existing back entry and kitchen, refinish second floor bathroom.
Drain - Underpinning existing basement walls, drop floor slab, finish basement including new bathroom and laundry, refinish existing back entry and kitchen, refinish second floor bathroom.
Underpinning existing basement walls, drop floor slab, finish basement including new bathroom and laundry, refinish existing back entry and kitchen, refinish second floor bathroom.
Plumbing - Underpinning existing basement walls, drop floor slab, finish basement including new bathroom and laundry, refinish existing back entry and kitchen, refinish second floor bathroom.
Page numbers are hidden until the total count is available from the data service.