73 WIDDICOMBE HILL BLVD
Rev 01: changes to methodology of demolitionProposed partial demolition of existing underground parking structure (including P2, P1 and surface level parking structure)
Showing first 16 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Rev 01: changes to methodology of demolitionProposed partial demolition of existing underground parking structure (including P2, P1 and surface level parking structure)
Proposal for retaining wall associated with temporary interim through construction existing tenant parking lots at site of a new infill apartment building (22m)
Proposed partial demolition of existing underground parking structure (including P2, P1 and surface level parking structure)
SITE SERVICING (CATCH BASINS; SWM) ASSOCIATED WITH A NEW TEMPORARY SURFACE-LEVEL PARKING LOT
Proposal to contruct 2 new residential buildings
Part Permit - New construction of a residential building with 101 units comprising of a 7-storey building including a 4-storey podium with two storey below grade parking garage, connected at the P1…
Drain - New construction of a residential building with 101 units comprising of a 7-storey building including a 4-storey podium with two storey below grade parking garage, connected at the P1 and P…
New construction of a residential building with 101 units comprising of a 7-storey building including a 4-storey podium with two storey below grade parking garage, connected at the P1 and P2 level …
Drain - New construction of a residential building with 101 units comprising of a 7-storey building including a 4-storey podium with two storey below grade parking garage, connected at the P1 and P…
HVAC - New construction of a residential building with 101 units comprising of a 7-storey building including a 4-storey podium with two storey below grade parking garage, connected at the P1 and P2…
Plumbing - New construction of a residential building with 101 units comprising of a 7-storey building including a 4-storey podium with two storey below grade parking garage, connected at the P1 an…
Proposal for multiple projects to an existing apartment building. Scope of work includes localized concrete repairs to the parking garage and balcony repairs including guards.
installation of two backflow prevention devices
Underground garage roof repairs and waterproofing.
Install ESP Natural gas Storage Unit for existing Generator on roof top of Apartment Building .
MAGNETIC LOCKS TO APARTMENT BUILDING
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.