75 GRAYDON HALL DR
Plumbing - Interior bathroom alteration in Unit 407: existing toilet to remain; new 30-inch shower base and drain location; bathroom extension approx. 24 inches into master bedroom; partition betwe…
Showing first 18 matching permits
More may match beyond this page.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Plumbing - Interior bathroom alteration in Unit 407: existing toilet to remain; new 30-inch shower base and drain location; bathroom extension approx. 24 inches into master bedroom; partition betwe…
Interior bathroom alteration in Unit 407: existing toilet to remain; new 30-inch shower base and drain location; bathroom extension approx. 24 inches into master bedroom; partition between bathroom…
Proposed fire alarm panel replacement.
Interior alterations to unit 1502
Proposal for suspended concrete slab repairs and replacement of the waterproofing membrane within the existing garage
Proposed garage roof slab repairs
Proposal to install fire sprinkler heads in the lobby and foyer area
Install a 4" backflow preventer
Garage roof slab rehabilitation at north and west elevation of the building
Fire Damage repairs to units 906 and 907
Fire Damage repairs to units 906 and 907
Above an existing parking garage, a fenced recycle bin enclosure consisting of concrete slab, curb and reconstruction repairs
Installation of back flow prevention device for condo building.
Balcony rehabilitation - 150 Balconies
Parking garage repair work - YCC #274
Parking garage repair work - YCC #274
Replace 48 balconies at Drop 6 & 7
EXTERIOR INSULATION AND FINISH SYSTEM. RETROFIT/RECLADDING - PHASES 3&4
End of list for these filters.
Updated Nov 19, 2026