77 ALAMEDA AVE
Drain - Proposed greater than 50% demoltion for new construction of SFD detached with integral garage
Showing first 9 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Drain - Proposed greater than 50% demoltion for new construction of SFD detached with integral garage
Plumbing - Proposed greater than 50% demoltion for new construction of SFD detached with integral garage
HVAC - Proposed greater than 50% demoltion for new construction of SFD detached with integral garage
Proposed greater than 50% demoltion for new construction of SFD detached with integral garage
REV 01: Revision to permit set drawings Proposal for a a rear/side addition, new 2nd floor addition, underpinning, interior alterations, rear basement entrance and a rear deck to the existing SFD-d…
Plumbing - Proposal for a a rear/side addition, new 2nd floor addition, underpinning, interior alterations, rear basement entrance and a rear deck to the existing SFD-detached dwelling.
Proposal for a a rear/side addition, new 2nd floor addition, underpinning, interior alterations, rear basement entrance and a rear deck to the existing SFD-detached dwelling.
Drain - Proposal for a a rear/side addition, new 2nd floor addition, underpinning, interior alterations, rear basement entrance and a rear deck to the existing SFD-detached dwelling.
Proposed alterations to the existing one-storey detached dwelling by constructing a front ground floor addition (porch enclosure), rear ground-floor additions, second and third-storey additions, a …
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.