Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
HVAC - Proposal for indoor gym
Plumbing - Proposal for indoor gym
A proposal to erect and display one illuminated projecting sign displaying static copy.***P***
THIS ALTERNATIVE SOLUTION PROPOSES THE OMISSION OF SPRINKLER SYSTEM PROTECTION UNDERNEATH THE EXTERIOR PORTION OF THE FIFTH FLOOR SLAB WHICH FORMS THE COVER OF THE BREEZEWAY
ALTERNATIVE SOLUTION PROPOSAL DETAILS THE INTENDED COMPENSATING MEASURES TO BE APPLIED DUE TO THE REDUCED POOL DECK WIDTH AT THE SOUTH SIDE OF THE OUTDOOR AMENITY POOL LOCATED ON LEVEL 11 OF THE 17…
Maglocks <<>>
Rev 02 - Re-issued Drawing SP-15:Sprinkler protection is required due to the occupancy above" as referenced in NFPA 13 2013 edition (highlighted in yellow on attached drawing) and was used when we …
HVAC - Basement alterations for the storage of wine for clients in individual storage lockers.
Plumbing - Basement alterations for the storage of wine for clients in individual storage lockers.
Basement alterations for the storage of wine for clients in individual storage lockers.
Revision 01 - after discussion with United Engineers propose to relocate both metres to the west side of the intake shaft, using 1-1/2 parking spaces, and building a shaft/enclosure around the inco…
Application for a permit to erect and display three wall signs and one projecting, all illuminated.*****CANNA CABANA*****
Revision 01 - structural revision to remove expansion joints.
To erect and display two illuminated wall signs.****META CANNABIS CO****
Proposal for interior alterations to existing retail store for a tenant fit out of a new retail store - Meta Growth
HVAC - Proposal for interior alteration for Meta Growth.
Alternative Solution Application to use Type304/304L, Schedule 40 stainless steel piping (as per Division-C; Section 2.1 of the OBC).
Part Permit - Proposal for new 29 storey condo with commercial at grade, 1531 resisential units, and 1 level of below grade parking.
Stand alone Excavation and Shoring work for soil investigation and remediation.
Page numbers are hidden until the total count is available from the data service.