Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Drain - PROPOSAL TO TRANSFORM EXISTING STAFF MEETING ROOM AT GROUND FLOOR TO A 1-BEDROOM RESIDENTIAL UNIT AND CONVERTING EXISTING ACTIVITY ROOM AT GROUND FLOOR TO A GUEST SUITE.ALTERATION TO PLUMBI…
PROPOSAL TO TRANSFORM EXISTING STAFF MEETING ROOM AT GROUND FLOOR TO A 1-BEDROOM RESIDENTIAL UNIT AND CONVERTING EXISTING ACTIVITY ROOM AT GROUND FLOOR TO A GUEST SUITE.ALTERATION TO PLUMBING, HVAC…
Plumbing - PROPOSAL TO TRANSFORM EXISTING STAFF MEETING ROOM AT GROUND FLOOR TO A 1-BEDROOM RESIDENTIAL UNIT AND CONVERTING EXISTING ACTIVITY ROOM AT GROUND FLOOR TO A GUEST SUITE.ALTERATION TO PLU…
HVAC - PROPOSAL TO TRANSFORM EXISTING STAFF MEETING ROOM AT GROUND FLOOR TO A 1-BEDROOM RESIDENTIAL UNIT AND CONVERTING EXISTING ACTIVITY ROOM AT GROUND FLOOR TO A GUEST SUITE.ALTERATION TO PLUMBIN…
Proposal for parkdale corbel and soffit repairs
Revision 02 - change the existing single stage alarm system for complex to modified single stage alarm system per approved AS 20 206726 ALT 00; changes include modifications to fire alarm system an…
Rev 01: Additional plumbing work for existing drain system in the Garbage Storage (101.1) and the Diversion room (101.2). Revision of the routing for the connection to the existing plumbing system …
REVISION#02: Addition of fire dampers in existing ventilation ducts crossing the corridor #2 and new location of a transfer duct serving the mailroom.Modification to the HVAC system. Addition of a …
Revision 01- See alternative solution 20 206726 ALT 00 AS. PERMIT RESUBMISSION TO UPDATE CODE REPORT AND RELATED DRAWINGS TO REFLECT AS-BUILT CONDITIONS, NOTING THE FOLLOWING CHANGES:-TOWER/AMENITY…
REV02: The scope of work in the basement 1. A corridor has been added to the scope of work to be sprinklered.REV01: Revision to permit 18-264771 BLD. Modification to the sprinkler work - Change in …
REV01: Revision to permit 18-264771 BLD. Modification to the sprinkler work - Change in the scope of work in the basement because of an existing corridor that has been removed by others. Revisions …
REVISION#1: Modification to the HVAC system. Addition of a Make up air transfer duct in the Diversion room (101.2). See clouded drawings attached.HVAC - Proposal for interior alterations to the gro…
Plumbing - Proposal for interior alterations to the ground floor amenity space, garbage / recycling rooms, lobby and corridors on all floors.
HVAC - Proposal for interior alterations to the ground floor amenity space, garbage / recycling rooms, lobby and corridors on all floors.
Proposal for interior alterations to the ground floor amenity space, garbage / recycling rooms, lobby and corridors on all floors.
Proposal to replace domestic hot & cold water riser piping and including domestic hot water recirculation piping within apartment building.
Proposal for cladding repairs to existing apartment building.
Conditional Permit - Part Permit - Amenity Building C to #40 and #50 HIGH PARK and #55 and 77 Quebec Avenue
Plumbing - Amenity Building C to #40 and #50 HIGH PARK and #55 and 77 Quebec Avenue
Page numbers are hidden until the total count is available from the data service.