777 R BAY ST
Interior alterations to create a storage room at P1 south parking level area.
- Permit number
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Interior alterations to create a storage room at P1 south parking level area.
Parking garage repairs: waterproofing system repairs, localized concrete repairs, suspended slab drain and piping replacement.
Proposal for waterproofing and localized surface concrete repairs at building entrance.
Localized concrete and wateproofing repairs at the vent shaft on P1 parking level
Interior alteration for new partition in Room MS-252, M-Level, multi-tenant floor. Alter plan to 23 152441 HVA 00 MS
New partition in Room MS-252, M-Level, multi-tenant floor. Alter plan to 23 152441 HVA 00 MS.
New partition in Room MS-252, M-Level, multi-tenant floor. Alter plan to 23 152441 HVA 00 MS.
New partition in Room MS-252, M-Level, multi-tenant floor. Alter plan to 23 152441 HVA 00 MS.
PROPOSED: New in-line supply air fan in Room MS-252, M-Level, multi-tenant floor. M-LEVEL
Plumbing - Proposal for interior alterations to existing office space on the 29th floor - UNIT 2901, "Xanadu"
Revision 02 - interior partitions.Revision 01 - additional work for same tenant HVAC - Proposal for interior alterations to existing office space on the 29th floor - UNIT 2901, "Xanadu"
Revison 02 - alterations of new partitions.Revision 01 - additional work for same tenant Proposal for interior alterations to existing office space on the 29th floor - UNIT 2901, "Xanadu"
New maglock in suite # 2901 related to permit # 21 165601
Install new electromagnetic to suite 2901
Revision 01 - additional work for same tenant Proposal for interior alterations to existing office space on the 29th floor - UNIT 2901, "Xanadu"
Revision 01 - additional work for same tenant HVAC - Proposal for interior alterations to existing office space on the 29th floor - UNIT 2901, "Xanadu"
REV 01: The installation of the new full T-bar ceiling on the entire floor has been deleted and the ceiling will be an open ceiling.Proposal for interior demolition to the 10th floor of an existing…
Proposal for interior alterations back to base on 9th floor of existing office building.
Plumbing - Proposal for interior alterations back to base on 9th floor of existing office building.
HVAC - Proposal for interior alterations back to base on 9th floor of existing office building.
Page numbers are hidden until the total count is available from the data service.