Showing first 7 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Revision #01 - HVAC - Changes to the interior ductwork layout.HVAC - Proposal to construct a 2nd floor rear addition over existing, front basement walkout, rear 2nd floor balcony over deck, and int…
REVISION#1: INTERIOR ALTERATIONS & smaller rear ground floor deck. No rear 2nd floor baclony. Proposal to construct a 2nd floor rear addition over existing, front basement walkout, rear 2nd floor b…
Plumbing - Proposal to construct a 2nd floor rear addition over existing, front basement walkout, rear 2nd floor balcony over deck, and interior alterations to convert from 2 units to 3 units. See …
HVAC - Proposal to construct a 2nd floor rear addition over existing, front basement walkout, rear 2nd floor balcony over deck, and interior alterations to convert from 2 units to 3 units. See ZZC …
Proposal for repair after vehicle impact damage for existing sfd-semi
Proposal to construct a 2nd floor rear addition over existing, front basement walkout, rear 2nd floor balcony over deck, and interior alterations to convert from 2 units to 3 units. See ZZC and COA.
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.