800 BAY ST
Proposal to supply and install backflow preventor one new 3" DCVA BFP to replace existing faulty 3" DCVA BFP.
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposal to supply and install backflow preventor one new 3" DCVA BFP to replace existing faulty 3" DCVA BFP.
HVAC - Proposal to construct interior alterations on 2nd and 3rd floor.
Proposal for interior alterations for an office fit-out on the existing 2nd & 3rd floor levels for tenant - 'U of T - Engineering Department'. Work includes new partitions, associated mechanical & …
Plumbing - Proposal to construct interior alterations on 2nd and 3rd floor.
HVAC - Proposal for interior alterations to office unit 403.
Plumbing - Proposal for interior alterations to office unit 403.
Proposal for interior alterations to office unit 403.
Plumbing - PROPOSED: INTERIOR ALTERATIONS AT GROUND FLOOR TO PROVIDE NEW OFFICES AND MEETING ROOM. (ALTERNA SAVINGS AND CREDIT UNION LTD)
HVAC - PROPOSED: INTERIOR ALTERATIONS AT GROUND FLOOR TO PROVIDE NEW OFFICES AND MEETING ROOM. (ALTERNA SAVINGS AND CREDIT UNION LTD)
PROPOSED: INTERIOR ALTERATIONS AT GROUND FLOOR TO PROVIDE NEW OFFICES AND MEETING ROOM. (ALTERNA SAVINGS AND CREDIT UNION LTD)
interior alterations for new tenant unit 400
Plumbing - interior alterations for new tenant unit 400
HVAC - interior alterations for new tenant unit 400
Proposal for interior alterations to return an exisiting office unit on the 4th floor level to base building condition. Work includes construction of a new demising wall to create a new smaller suite.
HVAC - Proposal for interior alterations to suite 401.
Proposal for interior alterations to suite 401 on the 4th floor.
HVAC - Interior alterations to tenant suite 401 at fourth floor
Interior alterations to tenant suite 401 at fourth floor
Proposed replacement of existing fire alarm control panel and one for one replacement of devices no alterations to wiring or zones
HVAC - Proposal for interior alterations in a unit on the 2nd floor of the existing office building
Page numbers are hidden until the total count is available from the data service.