Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
To erect and display one static non-illuminated overhanging sign and one illuminated ground sign.**WILLIAM F WHITE INTERNATIONAL**
FS - Sprinkler Shop Drawing - Proposal for interior alterations to existing warehouse unit #2 for storing of filming equipments for off-site filming. Installation of exterior overhead doors, access…
HVAC - Proposal for interior alterations to existing warehouse unit #2. Installation of exterior overhead doors, access ramp and exit stairs.
Proposal for interior alterations to existing warehouse unit #2 for storing of filming equipments for off-site filming. Installation of exterior overhead doors, access ramp and exit stairs.New tena…
Plumbing - Proposal for interior alterations to existing warehouse unit #2. Installation of exterior overhead doors, access ramp and exit stairs.
Install (3) catchbasins. Slight change to grades (locally)
Revision 04: Revised loading bay door, adjust exit corridor, add access doors between units, & add new office partirions.Revision 03:Revision to floor plan layout-unit 7.Revision 02: Revision to fl…
Revision 04: Revised sprinkler layout & add (1) HVAC unit.Revision 03: Revision to Hvac layout as per proposed building floor plan revison.Revision 02: Revision to floor layout for new tenant (Unit…
To erect and display one illuminated ground sign on the north-easterly corner of Islington and Evans Aves.**ComWeb**
Revision 03: Revision to plb layout as per proposed building floor plan revisonRevision 02: Revision to floor layout for new tenant (Unit 7) including new location of exit corridor. (Revision 01: R…
Revision 03:Revision to floor plan layout-unit 7.Revision 02: Revision to floor layout for new tenant (Unit 7) including new location of exit corridor and reduced number of overhead doors.Revision …
Revision 03: Revision to Hvac layout as per proposed building floor plan revison.Revision 02: Revision to floor layout for new tenant (Unit 7) including new location of exit corridor.(Revision 01: …
Revision 02: Revision to floor layout for new tenant (Unit 7) including new location of exit corridor.(Revision 01: Relocate ductwork. HVAC - Interior alteration on ground floor of existing buildin…
Revision 02: Revision to floor layout for new tenant (Unit 7) including new location of exit corridor and reduced number of overhead doors.Revision 01: Revision to location of demising wall between…
Revision 02: Revision to floor layout for new tenant (Unit 7) including new location of exit corridor. (Revision 01: Relocate washroomPlumbing - Interior alteration on ground floor of existing buil…
Revision 01: Relocate washroomPlumbing - Interior alteration on ground floor of existing building to create 3 new units by constructing demising walls within existing unit.Two units will be finishe…
Revision 01: Revision to location of demising wall between Unit 4 and Unit 7. Relocated washroom in Unit 4. Interior alteration on ground floor of existing building to create 3 new units by constru…
Revision 01: Relocate ductwork. HVAC - Interior alteration on ground floor of existing building to create 3 new units by constructing demising walls within existing unit.Two units will be finished …
Plumbing - Interior alteration on ground floor of existing building to create 3 new units by constructing demising walls within existing unit.Two units will be finished for new tenants and two unit…
Page numbers are hidden until the total count is available from the data service.