800 KIPLING AVE
Proposal to add fire alarm detection field devices and relays for elevator modrnization, CSA-B44 Intelligent recall
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposal to add fire alarm detection field devices and relays for elevator modrnization, CSA-B44 Intelligent recall
Proposal for interior alteration to convert existing auditorium to test lab.
Proposal for fire alarm system door holders
REV02: Proposed revision for removal of offices and a washroom on the main floor along with the hotelling station and board room on the mezzanine.Rev 01 - Revision to permit 25 122595 HVA 00 MS for…
REV03: Proposed revision for removal of offices and a washroom on the main floor along with the hotelling station and board room on the mezzanine. Addition of new roof over existing K22 tied into n…
REV02: Proposed revision for removal of offices and a washroom on the main floor along with the hotelling station and board room on the mezzanine.Revision to permit 25 122595 DRN 00 DR for removal …
REV02: Proposed revisions for removal of offices and a washroom on the main floor along with the hotelling station and board room on the mezzanine.Rev 01 - Revision to permit 25 122595 PLB 00 PS fo…
Rev 01 - Revision to permit 25 122595 PLB 00 PS for removal of offices and a washroom on the main floor along with the hotelling station and board room on the mezzanine.Plumbing - Proposed new pre-…
Rev 01 - Revision to permit 25 122595 HVA 00 MS for removal of offices and a washroom on the main floor along with the hotelling station and board room on the mezzanine.HVAC - Proposed new pre-engi…
Revision to permit 25 122595 DRN 00 DR for removal of offices and a washroom on the main floor along with the hotelling station and board room on the mezzanine.Drain - Proposed new pre-engineered b…
Rev 01 - Revision to permit 25 122595 BLD 00 NB for removal of offices and a washroom on the main floor along with the hotelling station and board room on the mezzanine. Addition of new roof over e…
To complete demolition of proposed building and backfill to grade.
FS - Sprinkler Shop Drawing - Proposed new pre-engineered building primarily to be used as a warehouse interconnected to existing building on site.
Plumbing - Proposed new pre-engineered building primarily to be used as a warehouse interconnected to existing building on site.
Drain - Proposed new pre-engineered building primarily to be used as a warehouse interconnected to existing building on site.
HVAC - Proposed new pre-engineered building primarily to be used as a warehouse interconnected to existing building on site.
Proposed new pre-engineered building primarily to be used as a warehouse interconnected to existing building on site.
Drain - Proposed new pre-engineered building primarily to be used as a warehouse interconnected to existing building on site.
Proposed 1-storey (28,343sq.m) TTC bus garage.
Proposed installation of Fire Alarm panel with built in annunciator and required initiating and signaling devices.Verification of system as per CAN/ULC S-537
Page numbers are hidden until the total count is available from the data service.