85 CONDOR AVE
HVAC - SECOND FLOOR FRONT AND REAR ADDITION (17.59 s/m)INTERIOR ALTERATIONS (75.61 s/m)
Showing first 12 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
HVAC - SECOND FLOOR FRONT AND REAR ADDITION (17.59 s/m)INTERIOR ALTERATIONS (75.61 s/m)
Revision #02 - Underpinning of front porch and framing.Revision #01 - Changes to the ground floor washroom and to add a second floor washroom. SECOND FLOOR FRONT AND REAR ADDITION (17.59 s/m)INTERI…
Plumbing - Revision #01 - Changes to the ground floor washroom and to add a second floor washroom. SECOND FLOOR FRONT AND REAR ADDITION (17.59 s/m)INTERIOR ALTERATIONS (75.61 s/m)
Revision #01 - Changes to the ground floor washroom and to add a second floor washroom. SECOND FLOOR FRONT AND REAR ADDITION (17.59 s/m)INTERIOR ALTERATIONS (75.61 s/m)
SECOND FLOOR FRONT AND REAR ADDITION (17.59 s/m)INTERIOR ALTERATIONS (75.61 s/m)
Plumbing - SECOND FLOOR FRONT AND REAR ADDITION (17.59 s/m)INTERIOR ALTERATIONS (75.61 s/m)
HVAC - Proposal to demolish the existing detached garage and construct a new 2 storey lane way suite. See also 19 265873 ZZC and 20 122106 MV.
Proposal to demolish the existing detached garage and construct a new 2 storey lane way suite. See also 19 265873 ZZC and 20 122106 MV.
Drain - Proposal to demolish the existing detached garage and construct a new 2 storey lane way suite. See also 19 265873 ZZC and 20 122106 MV.
Plumbing - Proposal to demolish the existing detached garage and construct a new 2 storey lane way suite. See also 19 265873 ZZC and 20 122106 MV.
basement underpinning, alteration, new walk out
Plumbing - basement underpinning, alteration, new walk out
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.