877 YONGE ST
Ground and Second Floor Remedial Work, including planter wall removal, door and storefront replacement, guard installation, canopy installation
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Ground and Second Floor Remedial Work, including planter wall removal, door and storefront replacement, guard installation, canopy installation
Bike room to partially move from basement to the ground level. Front portion of one vacant retail unit to be converted to residential amenity.
Proposal for rooftop solar panel installation.
Proposal for alterations to existing hvac systems
Revision #1 - new partition and door to subdivide existing office LB27.INTERIOR ALTERATION OF EXISTING LOWER BASEMENT SPACES TO CREATE NEWRESIDENTIAL AMENITY SPACE, NEW SERVICE CORRIDOR AND SUBDIVI…
REV 01 - See attached HVAC Plans and Letter for scope of workHVAC - Proposed interior alterations of existing lower basement spaces to create new performance hall, offices, rehearsal studio, green …
HVAC - Proposed interior alterations of existing lower basement spaces to create new performance hall, offices, rehearsal studio, green room and existing washrooms.
Plumbing - Proposed interior alterations of existing lower basement spaces to create new performance hall, offices, rehearsal studio, green room and existing washrooms.
Proposed interior alterations of existing lower basement spaces to create new performance hall, offices, rehearsal studio, green room and existing washrooms.
HVAC - INTERIOR ALTERATION OF EXISTING LOWER BASEMENT SPACES TO CREATE NEWRESIDENTIAL AMENITY SPACE, NEW SERVICE CORRIDOR AND SUBDIVIDE EXISTING MEETING SPACE. INTERIOR ALTERATION OF SECOND FLOOR F…
INTERIOR ALTERATION OF EXISTING LOWER BASEMENT SPACES TO CREATE NEWRESIDENTIAL AMENITY SPACE, NEW SERVICE CORRIDOR AND SUBDIVIDE EXISTING MEETING SPACE. INTERIOR ALTERATION OF SECOND FLOOR FORMER C…
Plumbing - INTERIOR ALTERATION OF EXISTING LOWER BASEMENT SPACES TO CREATE NEWRESIDENTIAL AMENITY SPACE, NEW SERVICE CORRIDOR AND SUBDIVIDE EXISTING MEETING SPACE. INTERIOR ALTERATION OF SECOND FLO…
To erect and display one non illuminated wall sign.****HAPPY BURGER****
REVISION - to reflect HVAC within suites to provide one (1) new backdraft damper on existing washroom ducts at new duct connection.HVAC - Proposal for interior alterations to existing senior reside…
HVAC - Partial interior renovation on floors 8 to 16: Renovation of 25 existing 1 bedroom units into 25 accessible 1 bedroom units.
Plumbing - Partial interior renovation on floors 8 to 16: Renovation of 25 existing 1 bedroom units into 25 accessible 1 bedroom units.
Partial interior renovation on floors 8 to 16: Renovation of 25 existing 1 bedroom units into 25 accessible 1 bedroom units.
Update existing sprinkler system based on new layout
REVISION - as per the Toronto Building Deficiency ReportProposal to install 28 maglocks on floors 2nd -16th of existing multiunit buildingNote: DJ Please chat with our inspector , Michele Argiro: SP
HVAC - Proposal for interior alterations to existing senior residential building.
Page numbers are hidden until the total count is available from the data service.