888 BIRCHMOUNT RD
Addition of 1 maglock on the fist floor and addition of 2 maglocks on the second floor.
Showing first 20 matching permits
More may match beyond this page.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Addition of 1 maglock on the fist floor and addition of 2 maglocks on the second floor.
Installation of four (4) upright sprinkler heads, one (1) pendent sprinkler head, and one (1) fire hose cabinet (FHC), including associated 1-inch branch piping, arm-over connections, and up to 50 …
FS - Sprinkler Shop Drawing - Proposal for interior alteration to vacant unit for fitout of new tenant.
Plumbing - Proposal for interior alteration to vacant unit for fitout of new tenant.
HVAC - Proposal for interior alteration to vacant unit for fitout of new tenant.
Proposal for interior alteration to vacant unit for fitout of new tenant.
HVAC - Proposal for a diesel generator upgrade.
Proposal for a diesel generator upgrade.
HVAC - INTERIOR ALTERATIONS OF EXISTING GROUP D SPACE- NEW MARKET FOR INTERNAL USE ONLY. SPACE INCLUDES NEW CAFE EQUIPMENT, ADDITIONAL PLUMBING, NEW CEILING AND PARTITIONS, REVISED MECHANICAL, ELEC…
Plumbing - INTERIOR ALTERATIONS OF EXISTING GROUP D SPACE- NEW MARKET FOR INTERNAL USE ONLY. SPACE INCLUDES NEW CAFE EQUIPMENT, ADDITIONAL PLUMBING, NEW CEILING AND PARTITIONS, REVISED MECHANICAL, …
INTERIOR ALTERATIONS OF EXISTING GROUP D SPACE - NEW MICRO MARKET FOR INTERNAL USE ONLY. SPACE INCLUDES NEW CAFE EQUIPMENT, ADDITIONAL PLUMBING, NEW CEILING AND PARTITIONS, REVISED MECHANICAL, ELEC…
proposing to install 1 maglock in ground floor. Please see the attached dwg. # E-1.3 on page 4 of 4.
Proposal for an alternative solution to install automatic turnstiles in the south entrance elevator lobby.
HVAC - Interior renovation of entrance lobby- removal of ceiling tiles, painting existing walls & reception desk.
Interior renovation of entrance lobby- removal of ceiling tiles, painting existing walls & reception desk.
Proposed replacement of existing cooling heat pumps with new HVAC system in the telecommunications room and intallation of new cooling and ventilation system in the B.O.A.T. storage.
Proposal to install total of 14 maglocks (5 ML on 3rd Floor, 4 ML on 4th Floor and 5 ML on 5th Floor.
PROPOSAL TO INSTALL TOTAL OF 10 MAGLOCKS (6 ML ON 6TH FLOOR AND 4 ML ON 7TH FLOOR)
HVAC - Proposed removal of section of wall to facilitate removal and reinstallation of chiller plant ( 2 Chillers, 2 Cooling Towers and 5 pumps) in mechanical penthouse.
Proposed removal of section of wall to facilitate removal and reinstallation of chiller plant ( 2 Chillers, 2 Cooling Towers and 5 pumps) in mechanical penthouse.