Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Plumbing - Interior renovation for a noodle restaurant, including building plumbing and HVAC work
HVAC - Interior renovation for a noodle restaurant, including building plumbing and HVAC work
Maglocks Testing and Verifications prior to 1st Occupancy
HVAC - Proposal for interior alterations to fit out a new TD Bank.
Proposal for interior alterations to fit out a new TD Bank.
Plumbing - Proposal for interior alterations to fit out a new TD Bank.
Proposed alternative solutions related to 22 193154 BLD 00 NB (block C), 22 200280 BLD 00 NB (block D) and 22 193961 BLD 00 NB (block E) related for providing 65 mm diameter standpipe hose connecti…
REV #01-fire protection systemProposal to construct a new 4 storey secondary school with 1 level of below grade parking. "Bloor Collegiate"
Proposal for partial demolition of existing secondary school. Demolish the west and south wings (central building retention) - Kent SchoolConvenience address is 980 Dufferin St.
Conditional Permit - Part Permit - Proposal to construct a new 4 storey secondary school with 1 level of below grade parking. "Bloor Collegiate"
Proposal to construct a new 4 storey secondary school with 1 level of below grade parking. "Bloor Collegiate"
Drain - Proposal to construct a new 4 storey secondary school with 1 level of below grade parking. "Bloor Collegiate"
HVAC - Proposal to construct a new 4 storey secondary school with 1 level of below grade parking. "Bloor Collegiate"
Plumbing - Proposal to construct a new 4 storey secondary school with 1 level of below grade parking. "Bloor Collegiate"
Drain - Proposal to construct a new 4 storey secondary school with 1 level of below grade parking. "Bloor Collegiate"
Proposal to demolish existing 4 storey secondary school.
HVAC - Make interior alterations to ground floor & basement of Secondary School; alter existing kitchen in basement, new elevator from basement to ground floor, alterations to classrooms.
Plumbing - Make interior alterations to ground floor & basement of Secondary School; alter existing kitchen in basement, new elevator from basement to ground floor, alterations to classrooms.
HVAC - Proposed interior alteration to portions of 2nd and third floor of Secondary School - Interior Alterations
Page numbers are hidden until the total count is available from the data service.