939 WARDEN AVE
Rev01: Revision to remove exit door. Proposal to construct one storey rear addition to existing warehouse.
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Rev01: Revision to remove exit door. Proposal to construct one storey rear addition to existing warehouse.
Rev 01: Proposal to remove exit door. Proposed new racking layout for end bay addition
REV01: as per drawing
HVAC - Proposed new racking layout for end bay addition
Proposed new racking layout for end bay addition
To erect and display two non-illuminated wall signs.****HOT SPOT AUTO PARTS****
REV #3-REVISE GARAGE DOOR TO MAN DOOR- Proposed removal of fire alarm.RAISE EXISTING ROOFINTERIOR OFFICE & WAREHOUSEEXTERIOR ALTERATIONS
REV01: Revision to permit 17-136830 HVA.HVAC - RAISE EXISTING ROOFINTERIOR OFFICE & WAREHOUSEEXTERIOR ALTERATIONS
Plumbing - Proposal to construct one storey rear addition to existing warehouse.
HVAC - Proposal to construct one storey rear addition to existing warehouse.
In conjunction with a two storey building on the premises, proposal to erect and display three wall signs, all non-illuminated and displaying static copy. The sign on the north elevation is 2.46 me…
Rev 2 - Proposed removal of fire alarm.RAISE EXISTING ROOFINTERIOR OFFICE & WAREHOUSEEXTERIOR ALTERATIONS
Revision 03 - revisions as per the attached drawingsRevision 01 - Revised drawings including change of the exterior material from metal panels to stucco, relocate the washrooms and add new washroom…
Proposal to extend an existing parapet on an existing warehouse.
Proposal to construct one storey rear addition to existing warehouse.
Revision 02 - revisions as per the attached drawingsRevision 01 - Revised drawings including change of the exterior material from metal panels to stucco, relocate the washrooms and add new washroom…
Proposed shelving and racking system.
Revision 01 - Revised drawings including change of the exterior material from metal panels to stucco, relocate the washrooms and add new washrooms, shifting the east wall to be outside the columns,…
Revision 01 - Revised drawings including change of the exterior material from metal panels to stucco, relocate the washrooms and add new washrooms, shifting the east wall to be outside the columns,…
Proposed demolition of warehouse building.
Page numbers are hidden until the total count is available from the data service.