Showing first 11 matching permits
More may match beyond this page.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
PROPOSAL TO ERECT TEMPORARY STRUCTURE (START DATE: 13 Jul 2024; END DATE 14 JUL. 24.
REV02 - Eliminated HVAC-4 from entrance vestibule and ducted return air from RTU-2 into main area.
Revisions 01: To address inspectors comments, changes are bubbledPlumbing - Proposed interior alteration of existing unit 950 for three additional bathrooms on the ground floor and upgrade existing…
Revisions 01: To address inspectors comments, changes are bubbledProposed interior alteration of existing unit 950 for three additional bathrooms on the ground floor and upgrade existing plumbing a…
Revisions 01: To address inspectors comments, changes are bubbledHVAC - Proposed interior alteration of existing unit 950 for three additional bathrooms on the ground floor and upgrade existing plu…
Proposed interior alteration of existing unit 950 for three additional bathrooms on the ground floor and upgrade existing plumbing and HVAC. Demolish the existing cooler walls and steel structure t…
HVAC - Proposed interior alteration of existing unit 950 for three additional bathrooms on the ground floor and upgrade existing plumbing and HVAC. Demolish the existing cooler walls and steel stru…
Plumbing - Proposed interior alteration of existing unit 950 for three additional bathrooms on the ground floor and upgrade existing plumbing and HVAC. Demolish the existing cooler walls and steel …
Revision 01: Details were revised as per engineer and site visit during demolition addition of stair encloseure.24.5m2Proposal for driveway/foundation reconstruction/repair.
Proposal for driveway/foundation reconstruction/repair.
End of list for these filters.
Updated Nov 15, 2026