388 CARLAW AVE
REV 01: loading dock, revised designDemolition of the existing loading dock along the west side of the building, including the walkway and the loading pad;- Construct a new reinforced concrete load…
Showing at least 1–20 (full catalogue count unavailable)
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REV 01: loading dock, revised designDemolition of the existing loading dock along the west side of the building, including the walkway and the loading pad;- Construct a new reinforced concrete load…
REV : Pro[posed revisions include addition of new east west corridor, demolition of 3 additional retail units, addition of new storage room and deletion/ modification of scope at south stair/ escal…
Demolition and recasting of entrance stairs and replacement of roof assembly above the main entrance podium structural slab.
Proposal for interior office alterations for tenant expansion including selective demolition, new offices, meeting rooms, and supporting spaces.
Proposed interior alterations. demolition and reconstructions of partitions.
Proposal for the demolition of half of the existing structure, stabilization of retained structure, construction of new north curtain wall, repair of bricks, windows, doors.Convenience address is 8…
Demolition and construction of interior office partitions for new tenant fit up (Unit 1800)
Proposed interior demolition of finishes and ceilies. All interior work including life safety to be completed by furture tenatnt under separate permit.
Proposed demolition of existing office layout and interior alteration for new tenant fit out. Unit 200
demolition of an existing single-storey building with basement, including partial retention of link structures and associated construction of permanent exterior façade assemblies at the remaining c…
Proposal for interior demolition to office space.
The scope of work includes demolition of existing office space of floors 3, 4, 6, 7, 15, 16
Proposed interior demolition and alteration to combine units C004 and C005, to create one larger unit C004.
Proposal for demolition back to bare building and minor alterations
Interior demolition and alteration to group D business.
REVISION 2 - to provide an outdoor playground for the new Daycare Centre or Day Nursery alterationProposed interior alteration of existing tenant space to Daycare Centre or Day Nursery and Exterior…
REV 01: Revision to add a fire seperation.INTERIOR DEMOLITION OF EXISTING - SUITE 2600
Proposed interior alterations to existing Assembly (Sports Centre)Structural interior alterations to install a new W-beam and lateral bracing to support a proposed foldable partition wall, includin…
Proposed demolition of interior partitions, removal of vault, grinding and sealing of floors.
REV01: Proposed revision interior alterations including demolition of interior partitions and construction of newProposed interior alterations - new tenant alteration into a vacant space. Construct…
Page numbers are hidden until the total count is available from the data service.