100 INTERNATIONAL BLVD
Plumbing - Proposal for interior alterations to existing laboratory to increase capacity, new make up air units at roof to support equipment
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Plumbing - Proposal for interior alterations to existing laboratory to increase capacity, new make up air units at roof to support equipment
HVAC - Proposal for interior alterations to existing laboratory to increase capacity, new make up air units at roof to support equipment
Proposal for interior alterations to existing laboratory to increase capacity, new make up air units at roof to support equipment
Plumbing - Proposal for interior alterations to enlarge an existing pipe room at Level 1 for the installation of a new water booster pump, including associated plumbing work with no change to use o…
Proposal for interior alterations to enlarge an existing pipe room at Level 1 for the installation of a new water booster pump, including associated plumbing work with no change to use or occupancy.
Proposed renovation of existing labs for new equipment layout, construct new floor area at existing pedestrian bridge, underpinning, new exterior canopy to existing building.
HVAC - Proposal for interior alterations to existing type D (office - 2nd floor) and to existing type F2 (Laboratory - gr & 2nd floor)
Proposal for interior alterations to existing type D (office - 2nd floor) and to existing type F2 (Laboratory - gr & 2nd floor)
Plumbing - Proposal for interior alterations to existing type D (office - 2nd floor) and to existing type F2 (Laboratory - gr & 2nd floor)
Plumbing - Interior alteration on second floor to demolish existing wall partitions and to build new, and to replace and re-align fume hood equipment.
HVAC - Interior alteration on second floor to demolish existing wall partitions and to build new, and to replace and re-align fume hood equipment.
Interior alterations to convert existing underground parking spaces into computer data and storage rooms.
HVAC - Structural alteration and interior alterations to accommodate new HVAC upgrade and new rooftop mechanical units (nos. 2, 3, and 4) - Unit no. 1 is existing.
Structural alteration and interior alterations to accommodate new HVAC upgrade and new rooftop mechanical units (nos. 2, 3, and 4) - Unit no. 1 is existing.
installation of a new fire alarm system
**REVISION: Additional drain lines and changes to original layout** Plumbing - Relocate existing IRL chemical lab from second floor to ground floor, install new test equipment.
HVAC - Relocate existing IRL chemical lab from second floor to ground floor, install new test equipment.
Plumbing - Relocate existing IRL chemical lab from second floor to ground floor, install new test equipment.
Relocate existing IRL chemical lab from second floor to ground floor, install new test equipment.
HVAC - Interior alterations to an existing laboratory: washroom relocation, new SDC office and lab.
Page numbers are hidden until the total count is available from the data service.