105 JOHNSTON AVE
REV 01: Revision required as setbacks in as-built survey do not match set backs in the original site plan for the prefab unit. Revision requested in order to to close building permit. as-built surv…
Showing first 3 matching permits
More may match beyond this page.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REV 01: Revision required as setbacks in as-built survey do not match set backs in the original site plan for the prefab unit. Revision requested in order to to close building permit. as-built surv…
Proposal for rear of backyard to be used for Garden Suite.
proposing interior alterations to existing single dwelling unit
End of list for these filters.
Updated Nov 21, 2026