132 CAMERON AVE
Revision to Changes to the basement floor plan layout. On the main floor, the kitchen and bathroom will be retrofitted. Additionally, a non-structural wall between the kitchen and the living/dining…
Showing first 4 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Revision to Changes to the basement floor plan layout. On the main floor, the kitchen and bathroom will be retrofitted. Additionally, a non-structural wall between the kitchen and the living/dining…
HVAC - Proposal to add a 2nd suite in the basement of an existing 1 storey detached dwelling.
Proposal to add a 2nd suite in the basement of an existing 1 storey detached dwelling.
Plumbing - Proposal to add a 2nd suite in the basement of an existing 1 storey detached dwelling.
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.