Showing first 11 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Plumbing - Storm pump replacement St George Subway Station
Drain - Storm pump replacement - St George Subway Station
Proposal to install a fire suppression system and a fire alarm panel.
FS - Sprinkler Shop Drawing - Proposal to demolish and construct 2 new walls, install new doors, replacement of small ventilation system using outdoor air for cooling, relocation and addition of po…
Proposal for fire alarm system upgrade. Scope of work includes replacinf fire alarm panel, EOLs, detecotrs, and bells/horns.
Interior alterations to renovate and increase occupant load from 4 to 12 in "Backup Transit Control Room" at platform level. St. George Station.
HVAC - Interior alterations to renovate and increase occupant load from 4 to 12 in "Backup Transit Control Room" at platform level. St. George Station.
install new fire alarm stystem througout st. george subway station. (4 stories).
INSTALL ON MEZZANINE LEVEL: 2 W.B., 2 W.C., 1 URINAL AND 2 WASH TUB. ON LOWER PLATFORM LEVEL: 1 SCRUBER DRAIN, 1 ELEVATOR PIT, 1 SUMP PUMP AND 1 OIL INTERSEPER. AF
INSTALL FIXTURES LOWER PLATFORM 1 ELEVATOR PIT DRAIN, 1 OIL INT. UPPER PLATFORM 1 ELEV. PIT DRAIN, MEZZANINE LEVEL 2 W.B., 2 W.C. 1 URNL., 2 W.T. COST INCLUDED WITH APPL.353681 SS PLANS
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.