150 KING ST W
Interior alterations for tenant on the 14th floor at 150 King St West. Scope includes demolition of non-load-bearing partitions and the re-alignment and redistribution of mechanical and life safety…
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Interior alterations for tenant on the 14th floor at 150 King St West. Scope includes demolition of non-load-bearing partitions and the re-alignment and redistribution of mechanical and life safety…
Plumbing - Install wall partitions, ceiling, plumbing & drainage connection to existing, existing fire protection
Install wall partitions, ceiling, plumbing & drainage connection to existing. Existing fire protection.
HVAC - Install wall partitions, ceiling, plumbing & drainage connection to existing, existing fire protection
Plumbing - Proposed Interior build-out and alterations to an existing offices.
HVAC - Proposed Interior build-out and alterations to an existing offices.
Proposed Interior build-out and alterations to an existing offices.
Proposed interior alterations on level 25 to reconfigure suites 2512 and 2509.
HVAC - Proposed interior alterations on level 25 to reconfigure suites 2512 and 2509.
Proposal for interior alterations to a portion of an existing office suite.
Plumbing - Proposed interior alterations for a model suite - Unit 1904
HVAC - Proposed interior alterations for a model suite - Unit 1904
Proposal for interior alterations for a new take-out restaurant - "Tacos Princesa"
HVAC - Proposal for interior alterations for a new take-out restaurant - "Tacos Princesa"
Proposal for interior alterations to take out restaurant for new tenant - "Pinto"
HVAC - Proposal for interior alterations to take out restaurant for new tenant - "Pinto"
FS - Sprinkler Shop Drawing - Interior build out of tenant space in existing Group 'D' Offices space.
Rev 01: revise number of maglocks to a total of 8 to be installed on 4th,5th,18th,26th floors onlyProposal to install total of fourteen maglocks in 4th, 5th, 6th, 18th & 26th floors.
Proposal to install total of fourteen maglocks in 4th, 5th, 6th, 18th & 26th floors.
Interior alterations to the 7th floor - including demising partition removal and minor renovations to suite. (clarification, the 7th floor is a co-working office and considered single tenancy)
Page numbers are hidden until the total count is available from the data service.