150 YORK ST
Revision 01: Revision to permitHVAC - Interior alterations to non-residential building existing office suite fit out - Suite 600
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Revision 01: Revision to permitHVAC - Interior alterations to non-residential building existing office suite fit out - Suite 600
The proposal is to permit a communication stair opening between 19th and 20th floors at this fully- sprinklered office building. Understanding that there is no fundamental difference between the pr…
REV 01: Revision to Permit #25 234705 BLD 00 BA to include alternative solution to exceed the maximum floor opening size for the convenience stair connecting the 19th floor and 20th floor, with com…
Revision 01: Proposal to include sprinkler drawings.Interior alterations for a new bar lounge, conference rooms and game room. Suite 401
This project consists of designing and installing modifications to the existing wet sprinkler system for an interior renovation on 12th floor, in an existing 20-storey building. The areas included …
PROPOSAL FOR INTERIOR ALTERATIONS TO A NON-RESIDENTIAL BUILDINGEXISTING OFFICE SUITE FIT-OUT.
Plumbing - PROPOSAL FOR INTERIOR ALTERATIONS TO A NON-RESIDENTIAL BUILDINGEXISTING OFFICE SUITE FIT-OUT.
HVAC - PROPOSAL FOR INTERIOR ALTERATIONS TO A NON-RESIDENTIAL BUILDINGEXISTING OFFICE SUITE FIT-OUT.
Plumbing - Interior alterations to non-residential building existing office suite fit out - Suite 600
HVAC - Interior alterations to non-residential building existing office suite fit out - Suite 600
Interior alterations to non-residential building existing office suite fit out - Suite 600
HVAC - Proposed interior alterations to floors 19 & 20.
Proposed interior alterations to floors 19 & 20.
Plumbing - Proposed interior alterations to floors 19 & 20.
Proposed interior alterations of office - tenancy in existing building
Rev 01: Work includes removal of interior non-load bearing walls, replacement of existing concrete topping and waterproofing system, installation of new concrete curb and block wall, and trench dra…
HVAC - Proposal for interior alterations to construct new staircase from 19th floor to 20th floor
Proposal for interior alterations to construct new staircase from 19th floor to 20th floor
Proposed interior alterations to unit 1212.
Plumbing - Interior alterations for a new bar lounge, conference rooms and game room. Suite 401
Page numbers are hidden until the total count is available from the data service.