175 BLOOR ST E
Proposed interior alterations to unit 1101 to expand existing boardroom and add two (2) small offices.
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposed interior alterations to unit 1101 to expand existing boardroom and add two (2) small offices.
HVAC - Proposed interior alterations to unit 1101 to expand existing boardroom and add two (2) small offices.
Interior alterations to combine suites 701 and 702 into a single tenant unit, including removal of the demising wall and relocation of the entrance door to swing in the direction of egress travel.
REV 01: Revision 01 to BLD and HVA Permits (Office Building - Interior Alterations)REV01: Relocated door Huddle Room 01, Removed partitions in Open Workspace 2, New sliding door, solid and glass pa…
REV 01: Revision 01 to BLD and HVA Permits (Office Building - Interior Alterations)REV01: Relocated door Huddle Room 01, Removed partitions in Open Workspace 2, New sliding door, solid and glass pa…
Proposal for interior alterations to existing office space - UNITS 600 & 603, "CMTO"
Plumbing - Proposal for interior alterations to existing office space - UNITS 600 & 603, "CMTO"
HVAC - Proposal for interior alterations to existing office space - UNITS 600 & 603, "CMTO"
HVAC - Proposed interior alteration for existing office suite fit out
Proposed interior alteration for existing office suite fit out
Proposal for interior alterations to unit 12-06, located on the 12th floor level to be converted from an office to a medical office / clinic for new tenant - 'Lume Women's Health'.
HVAC - Interior alterations on the 12th Floor - Unit 12-06 - Lume Women's Health
Proposal for interior alterations to an existing office space on the 7th floor (Base Building - Interior Partition & Ceiling Demo)
Plumbing - Demolition of tenant partitions, update of finishes and fixtures in washrooms and elevator lobby
HVAC - Demolition of tenant partitions, update of finishes and fixtures in washrooms and elevator lobby
Demolition of tenant partitions, enclose communicating stair connecting both storeys, update of finishes and fixtures in washrooms and elevator lobbyFloor 16 and 17 South Tower
HVAC - Interior alterations to ground floor to convert existing suite to prayer room for tenant use
Interior alterations to ground floor to convert existing suite to prayer room for tenant use
Plumbing - Interior alterations to ground floor to convert existing suite to prayer room for tenant use
HVAC - Proposal for interior alteration to existing office 14th South
Page numbers are hidden until the total count is available from the data service.