203-205 HUMBER COLLEGE BLVD
Replace backflow preventer - Humber College Student Residence
Showing first 6 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Replace backflow preventer - Humber College Student Residence
Construct Traction Power Substation - TPSS #1 for Finch West LRT
HVAC - Proposal to construct new 6 storey HLRC building at Humber College and one storey link on south side to existing "J" and "H" buildings.
Plumbing - Proposal to construct new 6 storey HLRC building at Humber College and one storey link on south side to existing "J" and "H" buildings.
Drain - Proposal to construct new 6 storey HLRC building at Humber College and one storey link on south side to existing "J" and "H" buildings.
Proposal to construct new 6 storey HLRC building at Humber College and one storey link on south side to existing "J" and "H" buildings.Resubmission set (architectural, ellectrical and mechanical pl…
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.