Proposal for an alternative solution to a standpipe system riser. As an alternative, a 3M fire barrier duct wrap 615 system is proposed to protect the rise.
REV -01 minor alteration.Plumbing - Propsoal for new stair tower and elevator addition for accessibility, rooftop mechanical unit, and interior alterations to University of Toronto Building - "Stud…
REV -01 minor alteration.HVAC - Propsoal for new stair tower and elevator addition for accessibility, rooftop mechanical unit, and interior alterations to University of Toronto Building - "Student …
Plumbing - Propsoal for new stair tower and elevator addition for accessibility, rooftop mechanical unit, and interior alterations to University of Toronto Building - "Student Commons".
HVAC - Propsoal for new stair tower and elevator addition for accessibility, rooftop mechanical unit, and interior alterations to University of Toronto Building - "Student Commons".
Proposal to install a solar collector and a Green Roof above existing building.
Interior alteration to 2nd floor offices
HVAC - 2nd floor seminar room
Plumbing - Install fixtures on ground floor 2 w.c., 2 w.b. (barrier free), 1 mop sink and install 1 catch basin at front entrance
Make interior alters to renovate and remove existing raised platform at inside west entrance. Remove and construct new stair btween ground and 1st floor levels. Construct new elevator lobby at grou…
CONSTRUCT 2 STOREY BAY ADDITION TO SOUTH ELEVATION, ALSO MAKE INTERIOR ALTERATIONS. SEE C OF A DEC. FINAL & BINDING 'HISTORICAL'THE FACULTY OF ARCHITECTURE, LANDSCAPE AND DESIGN