249 GARDEN AVE
Alterations at basement: remove existing concrete floor, pour new concrete floor slab and retrofit drains as required, insulate and finish basement perimeter walls, install new 3-pc bathroom, insta…
Showing first 1 matching permits
More may match beyond this page.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Alterations at basement: remove existing concrete floor, pour new concrete floor slab and retrofit drains as required, insulate and finish basement perimeter walls, install new 3-pc bathroom, insta…
End of list for these filters.
Updated Nov 16, 2026