2575 DANFORTH AVE
Localized concrete and drainage repairs, waterproofing renewal and expansion joint seal repairs to the underground parking garage.
Showing first 16 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Localized concrete and drainage repairs, waterproofing renewal and expansion joint seal repairs to the underground parking garage.
REVISION - change to the fire pump motor horsepowerProposal for a standpipe booster pump replacement
Proposal for a standpipe booster pump replacement
Localized concrete and drainage repairs, waterproofing renewal and expansion joint seal repairs to the underground parking garage.
Plumbing - Proposal for interior alterations to the main lobby and leasing office.
Revision 01: revised piping layout.Proposal to install 8" back flow prevention device in existing sprinkler/booster pump room in basement of existing appartment building, "Building B".
Proposal to install 8" back flow prevention device in existing sprinkler/booster pump room in basement of existing appartment building, "Building B".
FS - Sprinkler Shop Drawing - Proposal to construct interior alteration to units 7, 10, 15, 16 and 17 on the ground floor of the existing multiple use building.
Plumbing - Proposal to construct interior alteration to units 7, 10, 15, 16 and 17 on the ground floor of the existing multiple use building.
Permit for interior alterations to convert existing vacant retail store to restaurant under 30 seats - take out restaurant - Unit #4 - Subway.
Plumbing - Permit for interior alterations to convert existing vacant retail store to restaurant under 30 seats - take out restaurant - Unit #4 - Subway.
alter boiler replacement
(WORK BEING DONE AT 245 MAIN ST) p1 to p3 --MAIN SQUARE RECREATION CENTRE'. card printed
install fixtures in1st basement- 2 f.d., 2 w.c.,2 w.b., 2 h.w.t., 1 storage tank,1 2-compt. k.s.; 1st floor-6 planter drains, 1 manhole, 5 w.c., 2 w.c., 1 urinal, 1 k.s., 2 f.d.; 2nd basement 9 w.c…
HVAC and Plumbing works for ALTERATIONS TO EXISTING PARKING GARAGE FOR COMMUNITY CENTRE (WORK BEING DONE AT 245 MAIN ST) p1 to p3 --MAIN SQUARE RECREATION CENTRE'- For plans see base permit no.153961
install fixtures in1st basement- 2 f.d., 2 w.c.,2 w.b., 2 h.w.t., 1 storage tank,1 2-compt. k.s.; 1st floor-6 planter drains, 1 manhole, 5 w.c., 2 w.c., 1 urinal, 1 k.s., 2 f.d.; 2nd basement 9 w.c…
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.