Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REV 1: PER ATTACHED DETAIL SHEETPlumbing - Proposal for Alteration of existing retail suite, new internal partitions, doors and hardware, storefronts and finishes. Alterations to existing mechanica…
REV 1: PER ATTACHED DETAIL SHEETHVAC - Proposal for Alteration of existing retail suite, new internal partitions, doors and hardware, storefronts and finishes. Alterations to existing mechanical du…
REV 1: PER ATTACHED DETAIL SHEETProposal for Alteration of existing retail suite, new internal partitions, doors and hardware, storefronts and finishes. Alterations to existing mechanical ductwork …
Signage master plan required for permit application 2025 158205 SGN 00 SP / DST 00 DS.Four of the signs require a variance.
2 Projecting Signs on the third storey, east elevation and 2 wall signs, third storey,one on the east and one on the south elevation. (Approved as per variance # 25-173005)3 Wall Signs on the first…
HVAC - Proposal for Alteration of existing retail suite, new internal partitions, doors and hardware, storefronts and finishes. Alterations to existing mechanical ductwork and electrical distributi…
Proposal for Alteration of existing retail suite, new internal partitions, doors and hardware, storefronts and finishes. Alterations to existing mechanical ductwork and electrical distribution. New…
Plumbing - Proposal for Alteration of existing retail suite, new internal partitions, doors and hardware, storefronts and finishes. Alterations to existing mechanical ductwork and electrical distri…
Structural work - drilling holes in floor slab for plumbing rough-in only for new tenant, Separate tenant fit up permit will be required later day for full interior fit up
FS - Sprinkler Shop Drawing - Proposed alterations to existing space on levels 3, 4, & 5 back to base building, including the dmeolition of existing facade for future tenant facades.
HVAC - Interior fit out for a new Winners store.
REVISION 01: escalator PitAdding new escalator Pit
HVAC - Adding new escalator Pit
Adding new escalator Pit
REV 01: reduced size of the opening in the floor slab on the 7th floor & revision to structural drawingsProposal for interior alterations for tenant improvement renovations on existing vacant Level…
HVAC - Construct interior alterations on the 6th and 7th floors for BMO
Proposal for interior alterations for tenant improvement renovations on existing vacant Level 8 [6th Floor] & Level 9 [7th Floor] for an existing office tenant - 'BMO'. Scope: create an opening in …
Plumbing - Construct interior alterations on the 6th and 7th floors for BMO
Proposed removal of two existing VAV's and replacement with two new fan powered VAV boxes in an existing retail space (Nordstrom).
Page numbers are hidden until the total count is available from the data service.