2701 QUEEN ST E
Proposal to install a backflow prevention device in the pump station basement of existing industrial building - RC Harris Water Treatment Plant, Zebra Mussel Control System and Upgrades
Showing first 12 matching permits
More may match beyond this page.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposal to install a backflow prevention device in the pump station basement of existing industrial building - RC Harris Water Treatment Plant, Zebra Mussel Control System and Upgrades
Installation of Standby Generators for critical loads in the R.C. Harris Treatment Plant. Engineering disciplines incolved in this design/construction are Civil, Architectural, Mechanical, Electric…
HVAC - Installation of Standby Generators for critical loads in the R.C. Harris Treatment Plant. Engineering disciplines incolved in this design/construction are Civil, Architectural, Mechanical, E…
repair of existing building envelope, replace supporting steel angles. structural frame and rebuild security upgrade to main entrance and access road
FS - Sprinkler Shop Drawing - Interior alterations to existing RC HARRIS water treatment plant - Misc Areas
Rev-01 as requested by inspectorCONSTRUCTION OF RESIDUE MANAGEMENT FACILITY AT EXISTING CITY OF TORONTO R.C. HARRIS WATER FILTRATION PLANT PART PERMIT FOUNDATION #04123469PERMIT FOR SHORING #04123473
Plumbing - Interior alterations to change unused lab and offices into officesHarris Filtration Plant
PART PERMIT FOUNDATION FOR PERMIT #04116344
PERMIT FOR SHORING FOR PERMIT #04116344
Plumbing - CONSTRUCTION OF RESIDUE MANAGEMENT FACILITY AT EXISTING CITY OF TORONTO R.C. HARRIS WATER FILTRATION PLANT - New Building
CONSTRUCTION OF RESIDUE MANAGEMENT FACILITY AT EXISTING CITY OF TORONTO R.C. HARRIS WATER FILTRATION PLANT PART PERMIT FOUNDATION #04123469PERMIT FOR SHORING #04123473
FILTER AND ADMINISTRATION BUILDINGS SKYLIGHT, COPPER ROOF AND MASONARY REMEDIATION.