30 BOND ST
A sign permit to erect and display 1 overhanging structure sign + 4 wall signs, all displaying static copy.**THE SLAIGHT FAMILY EMERGENCY DEPARTMENT**
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
A sign permit to erect and display 1 overhanging structure sign + 4 wall signs, all displaying static copy.**THE SLAIGHT FAMILY EMERGENCY DEPARTMENT**
REVISION 3 - Revision to permit to remove the maglock from Door CN-L-B2AAdd 32 electromagnetic locks in Shuter Tower (levels B3 to L3) and in the Cardinal Carter Wing renovation area L1. Building p…
Proposal to provide F-K-5-1-12 Clean Agent System to Serve Hub Rooms and Electrical Rooms, and to provide fire alarm devices in 10th floor Existing Data Centre 10-183 and UPS room 10-184 and connec…
Rev 02: see cover letterRev 01: see cover letterProposal to construct a 2-storey addition to existing hospital. Scope of work includes demolishing existing 6 storey Shuter Wing and constructing new…
Rev 03: see cover letterRev 02: see cover letterREV 01: as per Builidng Inspector Deficiency request, see cover letter for scope HVAC - Proposal to construct a 2-storey addition to existing hospita…
REV 02: Revision to sprinkler system.Proposal for a new Fire Sprinkler System in an existing hospital - Shuter Tower (levels B3 to L3) and in the Cardinal Carter Wing renovation area L1
Rev 01: see cover letterPlumbing - Proposal to construct a 2-storey addition to existing hospital. Scope of work includes demolishing existing 6 storey Shuter Wing and constructing new Shuter Wing)…
Rev 01: see cover letterProposal to construct a 2-storey addition to existing hospital. Scope of work includes demolishing existing 6 storey Shuter Wing and constructing new Shuter Wing. See STE 16…
Rev 02: see cover letterREV 01: as per Builidng Inspector Deficiency request, see cover letter for scope HVAC - Proposal to construct a 2-storey addition to existing hospital. Scope of work include…
REVISION - to revise the Maglock Permit, based on the attached updated listAdd 32 electromagnetic locks in Shuter Tower (levels B3 to L3) and in the Cardinal Carter Wing renovation area L1. Buildin…
Proposal for interior alterations for Palliative Care unit refresh - level 4 Donnelly Wing
Plumbing - Proposal for interior alterations for Palliative Care unit refrece - level 4 Donnelly Wing
HVAC - Proposal for interior alterations for Palliative Care unit refrece - level 4 Donnelly Wing
Plumbing - Proposal for interior alterations to upgrade MRI rooms 1 & 4, also level B2 Cardinal Carter Wing.
Proposal for interior alterations to upgrade MRI rooms 1 & 4, also level B2 Cardinal Carter Wing.
HVAC - Proposal for interior alterations to upgrade MRI rooms 1 & 4, also level B2 Cardinal Carter Wing.
HVAC - Proposed interior alteration on Level 15 to relocate NICU. Proposed work includes a new air handling unit (AHU) in the roof, complete with service stair and platform.
Plumbing - Proposed interior alteration on Level 15 to relocate NICU. Proposed work includes a new air handling unit (AHU) in the roof, complete with service stair and platform.
Proposed interior alteration on Level 15 to relocate NICU. Proposed work includes a new air handling unit (AHU) in the roof, complete with service stair and platform.
Proposal for interior alterations for the upgrading of finishes and doors of the existing mental health rooms on the 17th floor - St. Michael's Hospital