333 BLOOR ST E
Proposal for replacement of the exterior ramp and improvements to the exterior stairs and entrance doors in order to meet with latest accessible requirements.
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposal for replacement of the exterior ramp and improvements to the exterior stairs and entrance doors in order to meet with latest accessible requirements.
Proposal for localized stone masonry repairs to the existing building.
REV 01: Proposal to replace two existing CRAC units with the new; add two new racks.Proposal to demolish a wall and closet, expand the technician office to be part of the data hub room in Basement …
Replace the existing fire alarm CACF, FACP panels, add extra speaker/strobes in corridor and public WC ; upgrade entire fire alarm system.
FS - Sprinkler Shop Drawing - Proposal for interior alterations to convert existing office/storage space in basement level into new chiller room with associated mechanical equipment, ventillation s…
HVAC - Proposal for interior alterations on the sub basement level for TSSA remedial work to the diesel fuel system.
Proposal for interior alterations on the sub basement level for TSSA remedial work to the diesel fuel system.
Plumbing - Proposal for interior alterations to office 10th floor
Proposal for interior alterations to office 10th floor
HVAC - Proposal for interior alterations to office 10th floor
Proposal to demolish a wall and closet, expand the technician office to be part of the data hub room in Basement Floor.
Proposal for the replacement of a concrete underground podium for exisitng multi unit building
Proposal for interior alterations (repairs) to the airshaft interior wall for fireproofing replacement.
Proposal for interior alterations to existing Rogers retail store - Unit 1
HVAC - Proposal for interior alterations to existing Rogers retail store - Unit 1
HVAC - Proposal for alterations to existing office building work includes removal of partition wall, replacement of generator and sprinkler upgrade to pre-action system on the 11 floor
Proposal for alterations to existing office building work includes removal of partition wall, replacement of generator and sprinkler upgrade to pre-action system on the 11 floor
HVAC - Proposed interior alterations to basement level UPS store.
Proposed interior alterations to basement level UPS room.
Revision to remove pull station at the top of stair.
Page numbers are hidden until the total count is available from the data service.