Showing first 19 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REVISION 3 - Inspector request. Refer to letter/drawings. HVAC - Proposed new tenant - interior alterations only for Northeastern University.
2 Projecting Sign1Overhanging Structure Sign
REVISION 2 - Inspector request. Refer to letter/drawings. The 4 drawings were omitted from HVA permit submissionHVAC - Proposed new tenant - interior alterations only for Northeastern University.
Proposal to add 5 maglock doors on the 3rd floor courtyard and bridge door.
Variance to allow for 2 projecting signs, illuminated and displaying static copy to be located less than 6 metres from one another and with a sign face area greater than 1.0 square metres. **Northe…
Plumbing - Construct 9 storey apartment building with resdiential 62 residential units, commerical on ground floor and 1 undergound parking garage
A 10-storey mixed-use building consisting of 62 residential units with commercial space on the ground floor. (Affordable Housing BY-LAW 335-2025)
HVAC - Construct 9 storey apartment building with resdiential 62 residential units, commerical on ground floor and 1 undergound parking garage
Proposal to construct a residential rental building with retail space on ground floor. A COA application is required to increase the height and all other zoning impacts.
REVISION 2 - removal of architectural features stair L5 to L6, removal of demolition to create floor opening, removal of floor planter beside stair L5, reconfiguration of services and fixturesPropo…
REVISION - removal of architectural features stair L5 to L6, removal of demolition to create floor opening, removal of floor planter beside stair L5, reconfiguration of services and fixturesHVAC - …
REVISION 01: BICYCLE RACK LAYOUT Proposed new tenant - interior alterations only for Northeastern University.
Shoring and Excavation work for remedial work.
HVAC - Proposed new tenant - interior alterations only for Northeastern University.
Proposed new tenant - interior alterations only for Northeastern University.
HVAC - Proposal for interior alterations (272m2), new entrance to lobby on ground floor, new elevator and stairs (throughout all floors).
HVAC - Interior alterations to convert existing retail store to new retail store at the ground floor level. **Payless Shoes**
HVAC - Interior alterations to portion of 2nd & 3rd floors for office space use. **Red Bull Canada**
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.