486 FRONT ST W
Proposal for one tiny pub and one pergola at the well open area, install date November 24th 2026 , tear down dates : November 30th 2026
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposal for one tiny pub and one pergola at the well open area, install date November 24th 2026 , tear down dates : November 30th 2026
REVISION - designate the patio as a private patio Proposal for interior alterations -Restaurant greater than 30 seats
Constructing a temporary pre-fab greenhouse at The Well for a sampling event for Oct 24th and 25th
Proposal to erect temporary yurt structure for The Well. Set up on October 19, 2026 and Tear down on Mar 31, 2027.
Proposal for retrofit of the existing kitchen fire suppression system following a kitchen equipment change. Three deep fryers under the existing exhaust hood have been replaced with two 4 burner ra…
HVAC - Proposal for interior alterations
Plumbing - Proposal for interior alterations
Proposal for interior alterations -Restaurant greater than 30 seats
HVAC - Proposal for interior alterations to retail store
Proposal for interior alterations to retail store
FS - Sprinkler Shop Drawing - Interior fit out for a reform studio (pilates studio) with interior partitions, HVAC and electrical in Units SF13 to SF15, second floor, BLDG A
Plumbing - Interior fit out for a reform studio (pilates studio) with interior partitions, HVAC and electrical in Units SF13 to SF15, second floor, BLDG A
HVAC - Interior fit out for a reform studio (pilates studio) with interior partitions, HVAC and electrical in Units SF13 to SF15, second floor, BLDG A
HVAC - Proposed interior tenant fit-up work at Unit LG10
HVAC - INTERIOR ALTERATIONS - NEW TENANT
INTERIOR ALTERATIONS - NEW TENANT
Plumbing - INTERIOR ALTERATIONS - NEW TENANT
HVAC - Proposed tenant fit-up for Unit UG26-27 at 'The Well' Building 'E'.
Plumbing - Proposed tenant fit-up for Unit UG26-27 at 'The Well' Building 'E'.
INTERIOR ALTERATION FOR NEW SMOOTHIE RESTAURANT INCLUDING NEW PLUMBING FOR KITCHEN SINKS AND HAND WASH SINKS
Page numbers are hidden until the total count is available from the data service.